The construction of the first superyacht by Sunreef, the Sunreef 102 Double Deck is in constant progress. At the moment, both the flybridge and the wet deck are already set up together forming one impressive superstructure. The last finishing works of the aluminum structure such as straightening, strain and stress relief have just been done. At the same time, Sunreef’s team of carpenters is getting ready to install all interior fittings on the yacht which is the first stage of general yacht finishing.
Together with the Sunreef 102, the second and the biggest superyacht to date by Sunreef, the Sunreef 114 is being built in the yard. The hulls are built upside down on technological foundation. All deck plates will be installed once the frames of the construction have been erected. The next step of the building process will be reversing the hull, due in the end of February 2009.
Sanlorenzo has a reputation of offering an unrivalled level of customization, which results in the fact that there are never two Sanlorenzo Yachts that are the same. This has been clearly demonstrated by the unique five-stateroom SL104 planing yacht, that will be on display at the Miami International Boat Show (MIBS) this week. Read More