| Project Name: |
|
Yacht type: |
Motor Yacht |
| Based concept: |
|
Sub type: |
Displacement
|
| Imo: |
1003865 |
MMSI: |
319534000 |
| Call sign: |
ZCOD2 |
SYT#: |
Y00895 |
| Flag: |
Cayman Islands |
Port of Registry: |
|
| |
| Length Overall (m): |
48.82 |
Length Overall (ft): |
160.17 |
| Length On Deck (m): |
|
Length On Deck (ft): |
|
| Length Waterline (m): |
44.00 |
Length Waterline (ft): |
144.36 |
| Beam (m): |
8.43 |
Beam (ft): |
27.66 |
| Draught Max (m): |
3.50 |
Draught Max (ft): |
11.48 |
| Draught Min (m): |
|
Draught Min (ft): |
|
| |
| Shipyard: |
Campanella S.p.A. (Cantieri Navali) |
Year: |
1981 |
| Hull: |
|
Status: |
Completed |
| Port: |
Savona |
Country: |
Italy |
| Comment: |
|
| |
| Naval Architect: |
Campanella S.p.A. (Cantieri Navali) |
| Exterior Designer: |
Giorgetti & Magrini |
| Interior Designer: |
H2 Yacht Design |
| Hull Material: |
Steel |
Superstructure: |
Aluminium |
| Gross Tonnage: |
404 |
Displacement: |
|
| Class: |
Lloyds Register |
| Class Comments: |
|
| MCA: |
No |
| |
| Guest Cabins: |
6 |
| Guests: |
12 |
Max Charter Guests: |
|
| Crew Cabins: |
|
Crew: |
12 |
| |
| Engine Manufacturer: |
Nohab |
Model: |
Polar |
| Number of Engines: |
2 |
Type: |
Diesel |
| HP: |
1,320 |
KW: |
984 |
| Total HP: |
2,640 |
Total KW: |
1,969 |
| |
| Engines: |
|
| Max Speed: |
15.5 |
Cruise Speed: |
13 |
| Range: |
3,500 |
Propulsion: |
Twin Screw |
| |
| Fuel Capacity (Liters): |
76,700 |
Fuel Capacity (Gallons): |
20,264 |
| Water Capacity (Liters): |
34,500 |
Water Capacity (Gallons): |
9,115 |
| |
| Sail Area: |
|
| |
| Website: |
|
Description
Mary-Jean is an extremely seaworthy and comfortable vessel, and boasts an elegant and modern designed interior with muted fabrics by Steve Howard of H2 Design.
The lounges and deck areas onboard Mary-Jean are spacious and ideal for entertaining, and she now has the addition of a gym on the upper deck, with flat-screen TV's throughout. She also benefits from a sloping transom with built-in stairs for easy access to the swim platform. All new teak decks were laid in early 2008 and her hull and superstructure fully re-painted.
Photos by YPI.
Refit details
| Year |
Shipyard |
Work done |
Status |
|
2004-2005 |
Astilleros de Mallorca S.A. |
Work included a 4 meter hull extension, the addition of a Jacuzzi structure on the front of the sun deck, new mast structure, complete new owners and guest accommodation, new crew accommodation and galley, and a complete paint job and full Lloyds Classification. |
Finished |
History Sales Information
Exterior Photos
Interior Photos