Conrad’s first C144S superyacht enters outfitting phase

The completed structure of the first Conrad C144S superyacht has been placed into the shipyard’s outfitting hall in Gdansk, Poland where the yacht’s interiors and equipment will be installed. The move reveals the first look of the 44.27-metre yacht’s completed silhouette.Conrad C144S/01 yacht under construction Photo: Conrad YachtsThe muscular lines of her exterior are the works of Reymond Langton Design with naval architecture by Diana Yacht Design. Her interior, also now well underway, has been designed by m2atelier.

Conrad C144S/01 yacht under construction Photo: Conrad Yachts Conrad C144S/01 yacht under construction Photo: Conrad YachtsUpon completion, she will be able to accommodate up to 10 guests across five staterooms, including a private owner’s suite and four VIP cabins, as well as nine crew members to take care of them.Conrad C144S/01 yacht under construction Photo: Conrad YachtsConrad C144S/01 yacht under construction Photo: Conrad YachtsThe C144S offers ample leisure spaces including an aft platform beach club, four separate lounge areas, two bars and dining areas and an infinity pool on her sundeck.Conrad C144S/01 yacht under construction Photo: Conrad YachtsThe owner of the first C144S is to visit the shipyard in March to check the progress of the project ahead of her expected delivery date in 2022. A second hull is also currently in-build.

© SuperYacht Times B.V. // All rights reserved.